Difference between revisions of "Breadboard Menorah Alternate Build"
From Evil Mad Scientist Wiki
Line 3: | Line 3: | ||
==Instruction changes for building the breadboard menorah with the shamash on the end.== | ==Instruction changes for building the breadboard menorah with the shamash on the end.== | ||
− | The notes below outline the changes to the printed instructions ([http://shop.emscdn.com/KitInstrux/breadboard-menorah-instrux- | + | The notes below outline the changes to the printed instructions ([http://shop.emscdn.com/KitInstrux/breadboard-menorah-instrux-d.pdf PDF Version] 1.3 MB) needed in order to build the breadboard menorah with the shamash on the end rather than in the middle. Please read all the way through prior to bending or clipping any resistors or jumpers! |
Line 23: | Line 23: | ||
<img src="http://shop.emscdn.com/wiki/bbmk/bbmk_alt6.png" height="279" width="810"> | <img src="http://shop.emscdn.com/wiki/bbmk/bbmk_alt6.png" height="279" width="810"> | ||
+ | * Install all of the components described in this step except for 0.5" zero-ohms #5 and #6 | ||
* Place the 51 ohm resistor from 31-c to 32-c | * Place the 51 ohm resistor from 31-c to 32-c | ||
− | * Connect 0.2" jumper wire from 30-h to 32-h | + | * Connect the 0.2" jumper wire from 30-h to 32-h |
* Place the second 0.7” jumper from 50-f to 55-c | * Place the second 0.7” jumper from 50-f to 55-c | ||
Revision as of 23:54, 17 November 2013
This page is part of the documentation for the Deluxe Electronic Breadboard Menorah Kit.
Instruction changes for building the breadboard menorah with the shamash on the end.
The notes below outline the changes to the printed instructions (PDF Version 1.3 MB) needed in order to build the breadboard menorah with the shamash on the end rather than in the middle. Please read all the way through prior to bending or clipping any resistors or jumpers!
In Step 2
- Instead of bending six zero-ohm jumpers to 0.5", only bend four to 0.5"
- Instead of bending one zero-ohm jumper to 0.7", bend two to 0.7"
- Instead of leaving one zero-ohm jumper straight, leave two straight
- Overall, you should have the following lengths of zero-ohm jumpers: 0.4", 0.5" (X4), 0.7" (X2), 1.8", straight (X2)
- Construct a 0.2" jumper wire from the clipped lead of a 0.4" zero-ohm jumper or resistor
- Bend the 51 ohm resistor into a U-shape immediately after the resistor body and clip the leads to 0.3" long, like so:
In step 3E
- Install all of the components described in this step except for 0.5" zero-ohms #5 and #6
- Place the 51 ohm resistor from 31-c to 32-c
- Connect the 0.2" jumper wire from 30-h to 32-h
- Place the second 0.7” jumper from 50-f to 55-c
In step 4
- Prepare a Red LED according to the procedure for the Yellow LED, instead twisting one zero-ohm jumper to each leg. On the long lead of the LED, place the body of the jumper slightly lower so that you can tell them apart. Insert from 55-a (long lead) to the blue stripe (short lead).
In Step 5
- The Yellow LED goes from 31-a to the blue stripe.